This Manufacturing Lighting Project consists of 412 existing fixtures. Quantity of new fixtures is 412.There are three different fixture heights ( 14', 20', 22') in the production area. All of fixtures can be accessed via a 25' working platform scissor lift. Customer has stated that Electrical Contractor may use their boom lift for fixtures not accessible by a scissor lift. Include in price the rental for all equipment required. All hibay fixtures to be provided with hanging kits. There are 12 fixture mounted sensors to be install in the high bay bundy area. Please verify location with customer.
Customer to supply mc cable or SJ cord for the connection of new fixtures in the production area. Electrical contractor to provide 382 mc or SJ cord connectors for connection of mc cable or SJ cord. Reuse existing flex connections for the troffer fixtures in the office area.
Staging area was discussed and possible fixture assembly area to be located across the street. Customer has agreed to transfer fixtures from fixture assembly area to installation area.